{"id":4355,"date":"2022-02-15T15:50:06","date_gmt":"2022-02-15T07:50:06","guid":{"rendered":"https:\/\/keooya.com\/?p=4355"},"modified":"2023-09-12T18:54:04","modified_gmt":"2023-09-12T10:54:04","slug":"the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design","status":"publish","type":"post","link":"https:\/\/kerooya.com\/zh\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/","title":{"rendered":"The Beijing Winter Olympics kicked off! A glimpse of the venue&#8217;s cutting-edge design"},"content":{"rendered":"<p class=\"has-text-align-center wp-block-paragraph\"><strong>Gu Ailing(Eileen)&nbsp;wins gold medal in Hougang ski platform, the stunning opening of Beijing Winter Olympics!&nbsp;Take in the cutting-edge design of the pavilion<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Designers<br>Hello everyone!<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The opening ceremony of the Beijing 2022 Winter Olympics has been held a few days ago<br>Held successfully at the National Stadium &#8220;Bird&#8217;s Nest&#8221;<br>Zhang Yimou, the chief director of the opening ceremony<br>Presenting a game that does not lose in 2008<br>The visual gluttony of the opening ceremony of the Beijing Olympic Games<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"640\" height=\"281\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/1.gif\" alt=\"\" class=\"wp-image-4358\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"640\" height=\"282\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/2.gif\" alt=\"\" class=\"wp-image-4359\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"640\" height=\"281\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/3.gif\" alt=\"\" class=\"wp-image-4360\"\/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">A group of architectural concepts<br>New Winter Olympics venues also officially unveiled<br>let&#8217;s take a look<br>Design each venue!<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"282\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/4-1.gif\" alt=\"\" class=\"wp-image-4364\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"01-new-winter-olympics-venuesnew-stadium\">01.<br>New Winter Olympics venues<br>NEW STADIUM<\/h2>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">24 Winter Olympic venues and<br>31 supporting infrastructures lasted more than 3 years<br>All construction completed<br>Distributed in the three competition areas of Beijing, Yanqing, and Zhangjiakou<br>Several new pavilions from building appearance to naming<br>The intentions are fully integrated into the elements of Chinese culture<br>became a remarkable landmark<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"268\" height=\"300\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/5-268x300.jpg\" alt=\"\" class=\"wp-image-4365\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/5-268x300.jpg 268w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/5-11x12.jpg 11w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/5-600x672.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/5-64x72.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/5.jpg 640w\" sizes=\"(max-width: 268px) 100vw, 268px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"666\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/6.jpg\" alt=\"\" class=\"wp-image-4366\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/6.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/6-270x300.jpg 270w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/6-11x12.jpg 11w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/6-64x71.jpg 64w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"tw-target-text\"><strong>01. National Speed \u200b\u200b<\/strong><\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\" id=\"tw-target-text\">Skating Hall Design\u4e28Populous Architects <\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\" id=\"tw-target-text\">Beijing Architectural Design and Research Institute Region\u4e28Beijing Division<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"555\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/7-1024x555.jpg\" alt=\"\" class=\"wp-image-4368\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/7-1024x555.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/7-300x163.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/7-768x416.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/7-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/7-600x325.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/7-64x35.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/7.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">by architecture firm Populous<br>Designed Oval National Speed \u200b\u200bSkating Hall<br>In Beijing Olympic Park<br>especially for the 2022 Winter Olympics<br>The only new venue<br>The original site of the project is the 2008 Beijing Olympic Games<br>Temporary venues for archery and hockey rinks<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"338\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/8.gif\" alt=\"\" class=\"wp-image-4369\"\/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The shape of the speed skating hall has 22<br>Flowy glowing &#8220;ribbon&#8221; composition<br>very linear<br>12,000 seats on a 400-meter-long slide<br>Everyone in the audience can hear<br>&#8220;Every time the skates roll over the ice&#8221;<br>Therefore, it was given the image name of &#8220;Ice Ribbon&#8221;.<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/9-1024x1024.jpg\" alt=\"\" class=\"wp-image-4371\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/9-1024x1024.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/9-300x300.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/9-150x150.jpg 150w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/9-768x768.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/9-12x12.jpg 12w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/9-600x600.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/9-100x100.jpg 100w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/9-64x64.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/9.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The interior space of the venue also revolves around<br>Ellipse surface rotates up<br>Symbol of speed and passion<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"338\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/10.gif\" alt=\"\" class=\"wp-image-4373\"\/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The National Speed \u200b\u200bSkating Stadium has the largest all-ice design in Asia<br>The ice surface area reaches 12,000 square meters<br>Can accommodate more than 2000 people<br>Ice hockey, figure skating, and other ice sports can be carried out at the same time<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"338\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/11.gif\" alt=\"\" class=\"wp-image-4374\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/12-1024x683.jpg\" alt=\"\" class=\"wp-image-4375\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/12-1024x683.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/12-300x200.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/12-768x512.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/12-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/12-600x400.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/12-64x43.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/12.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/14-1024x683.jpg\" alt=\"\" class=\"wp-image-4377\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/14-1024x683.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/14-300x200.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/14-768x512.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/14-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/14-600x400.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/14-64x43.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/14.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"338\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/15.gif\" alt=\"\" class=\"wp-image-4378\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/16-1024x768.jpg\" alt=\"\" class=\"wp-image-4379\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/16-1024x768.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/16-300x225.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/16-768x576.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/16-16x12.jpg 16w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/16-600x450.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/16-64x48.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/16.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/17-1024x768.jpg\" alt=\"\" class=\"wp-image-4380\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/17-1024x768.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/17-300x225.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/17-768x576.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/17-16x12.jpg 16w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/17-600x450.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/17-64x48.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/17.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/18-1024x768.jpg\" alt=\"\" class=\"wp-image-4381\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/18-1024x768.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/18-300x225.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/18-768x576.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/18-16x12.jpg 16w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/18-600x450.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/18-64x48.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/18.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"tw-target-text\">02. Shougang Ski Jump<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Design\u4e28Architectural Design and Research Institute of Tsinghua University<br>team mines<br>Region\u4e28Beijing Division<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"632\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19-1024x632.jpg\" alt=\"\" class=\"wp-image-4383\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19-1024x632.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19-300x185.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19-768x474.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19-600x371.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19-64x40.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The most unique venue design for the Beijing Winter Olympics<br>It must belong to the Shougang ski jumping platform.<br>It is also one of the new venues built for the Winter Olympics<br>Organizers say this is the world<br>The first permanent big jumping arena<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"338\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/20.gif\" alt=\"\" class=\"wp-image-4384\"\/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The venue is designed by the Architectural Design and Research Institute of Tsinghua University<br>Jiang Studio hosted by Dean Professor Zhang Li<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"302\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/22-1024x302.jpg\" alt=\"\" class=\"wp-image-4385\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/22-1024x302.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/22-300x89.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/22-768x227.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/22-18x5.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/22-600x177.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/22-64x19.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/22.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The outer skin of the big platform is easy to install<br>And high-quality perforated aluminum plate<br>Has the colors of the Winter Olympics emblem<br>Gradient look for the base<br>Built around the ruins of the Shougang Steel Works<br>using industrial heritage<br>Another innovative project of urban renewal<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"528\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/23-1024x528.jpg\" alt=\"\" class=\"wp-image-4386\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/23-1024x528.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/23-300x155.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/23-768x396.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/23-18x9.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/23-600x309.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/23-64x33.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/23.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The main body of the platform is the steel structure<br>The total height is 60.5 meters and the length is about 164 meters<br>The amount of steel used in the main structure has reached 4,100 tons<br>Among them, a large number of high-strength steel and weathering steel are used<br>According to the designer<br>The project saves a total of 9.75% in steel consumption<br>Reduce carbon emissions by about 950 tons<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"655\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/24-1024x655.jpg\" alt=\"\" class=\"wp-image-4387\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/24-1024x655.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/24-300x192.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/24-768x491.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/24-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/24-600x384.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/24-64x41.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/24.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">It will host freestyle skiing and<br>Snowboarding, diving, and other events<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"446\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/26-1024x446.jpg\" alt=\"\" class=\"wp-image-4388\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/26-1024x446.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/26-300x131.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/26-768x334.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/26-18x8.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/26-600x261.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/26-64x28.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/26.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"852\" height=\"639\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/27.jpg\" alt=\"\" class=\"wp-image-4389\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/27.jpg 852w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/27-300x225.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/27-768x576.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/27-16x12.jpg 16w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/27-600x450.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/27-64x48.jpg 64w\" sizes=\"(max-width: 852px) 100vw, 852px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/28-1024x576.jpg\" alt=\"\" class=\"wp-image-4390\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/28-1024x576.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/28-300x169.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/28-768x432.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/28-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/28-600x338.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/28-64x36.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/28.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"683\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/29.jpg\" alt=\"\" class=\"wp-image-4391\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/29.jpg 1000w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/29-300x205.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/29-768x525.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/29-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/29-600x410.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/29-64x44.jpg 64w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"tw-target-text\">03. National Snowmobile Center<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>Design\u4e28China Architectural Design and Research Institute<br>Li Xinggang Studio<br>Region\u4e28Yanqing Division<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The National Snowmobile Center is located in<br>75 kilometers north of Beijing<br>Yanqing Winter Olympics<br>The total length is 1975 meters, also known as &#8220;Snow Dragon&#8221;<br>It will be used as a snowmobile, sledding venue<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"338\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/30.gif\" alt=\"\" class=\"wp-image-4394\"\/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The glide track features a laminated wooden roof<br>From a distance, it looks like a dragon<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"529\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/31.jpg\" alt=\"\" class=\"wp-image-4395\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/31.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/31-300x248.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/31-15x12.jpg 15w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/31-600x496.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/31-64x53.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/32-1024x683.jpg\" alt=\"\" class=\"wp-image-4396\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/32-1024x683.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/32-300x200.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/32-768x512.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/32-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/32-600x400.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/32-64x43.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/32.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">It is the first in China<br>It is also the third skating sports track in Asia.<br>An architect by China Architectural Design and Research Institute<br>Li Xinggang&#8217;s studio design<br>Not only does the extremely complex<br>Construction with curved concrete spraying technology<br>It also overcomes many technical difficulties in engineering<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"338\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/33.gif\" alt=\"\" class=\"wp-image-4397\"\/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Designed as a Winter Olympics<br>One of the most difficult new competition venues<br>The national snowmobile sled&#8217;s track is divided into 54 refrigeration units<br>The total length is 1975 meters<br>The vertical drop alone has exceeded 121 meters<br>And it has to be determined by 16 angles and inclinations<br>Combination of different curves<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"636\" height=\"421\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/34.jpg\" alt=\"\" class=\"wp-image-4398\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/34.jpg 636w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/34-300x199.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/34-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/34-600x397.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/34-64x42.jpg 64w\" sizes=\"(max-width: 636px) 100vw, 636px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"360\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/35.jpg\" alt=\"\" class=\"wp-image-4399\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/35.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/35-300x169.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/35-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/35-600x338.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/35-64x36.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"325\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/36.jpg\" alt=\"\" class=\"wp-image-4400\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/36.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/36-300x152.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/36-18x9.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/36-600x305.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/36-64x33.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"669\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/39-1024x669.jpg\" alt=\"\" class=\"wp-image-4401\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/39-1024x669.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/39-300x196.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/39-768x502.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/39-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/39-600x392.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/39-64x42.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/39.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"tw-target-text\">04. National Ski Jumping Center<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Design\u4e28Architectural Design and Research Institute of Tsinghua University<br>Jiang Studio<br>Region\u4e28Zhangjiakou Division<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"406\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/40.jpg\" alt=\"\" class=\"wp-image-4403\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/40.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/40-300x190.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/40-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/40-600x381.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/40-64x41.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Designed by Jianmeng Studio for the Winter Olympics<br>Another new venue &#8211; the National Ski Jumping Center<br>Also known as &#8220;Snow Ruyi&#8221;<br>It is the first standard ski jumping venue in my country<br>It is also the largest project in the Zhangjiakou host area.<br>The most technically difficult competition venue<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"567\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/41-1024x567.jpg\" alt=\"\" class=\"wp-image-4404\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/41-1024x567.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/41-300x166.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/41-768x425.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/41-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/41-600x332.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/41-64x35.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/41.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">National Ski Jumping Center &#8220;Xue Ruyi&#8221;<br>As the Beijing 2022 Winter Olympics<br>Mountain landmark venues in Zhangjiakou competition area<br>Covers an area of \u200b\u200babout 62hm\u00b2<br>Located in the northwest corner of Zhangjiakou ancient poplar group<br>600m in a straight line from the north side of the main entrance square of the ancient poplar<br>The shape of its competition venue is in line with the traditional Chinese ornament &#8220;Ruyi&#8221;<br>Including the summit club on the mountain and the grandstand area below the mountain<br>Competition area and comprehensive area, etc.<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/42.jpg\" alt=\"\" class=\"wp-image-4405\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/42.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/42-300x225.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/42-768x576.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/42-16x12.jpg 16w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/42-600x450.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/42-64x48.jpg 64w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The main body of the diving platform and the top cantilever of the summit club<br>And the truss adopts a steel structure<br>Reduce carbon consumption at source compared to concrete structures<br>Referee tower and spectator stand<br>Prefabricated concrete slabs and other prefabricated structural systems<br>Among them, there are 5,100 prefabricated panels for the stands<br>Significant carbon reduction in the construction phase<br>The outer ring of the summit club adopts a unitized curtain wall system<br>Among them, there are 156 pieces of curved glass and 1166 pieces of non-transparent glass.<br>Conducive to improving the convenience and accuracy of mountain construction operations<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/43-1024x576.jpg\" alt=\"\" class=\"wp-image-4406\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/43-1024x576.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/43-300x169.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/43-768x432.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/43-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/43-600x338.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/43-64x36.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/43.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/44-1024x576.jpg\" alt=\"\" class=\"wp-image-4407\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/44-1024x576.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/44-300x169.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/44-768x432.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/44-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/44-600x338.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/44-64x36.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/44.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">In recent years, the ski jumping run structure<br>The surface material has gradually changed from snow to ice<br>The first in the history of the Winter Olympics<br>Big jump with ice slides<br>National Ski Jumping Center under construction<br>The ice slurry used is a solid-liquid two-phase material<br>The mixing ratio of snow and water is particularly important<br>At the same time, the achievement of an athlete&#8217;s good performance is related to<br>There is a greater relationship between the acceleration performance of the ski jumping run<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"656\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/45.jpg\" alt=\"\" class=\"wp-image-4408\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/45.jpg 960w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/45-300x205.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/45-768x525.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/45-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/45-600x410.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/45-64x44.jpg 64w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"573\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/46.jpg\" alt=\"\" class=\"wp-image-4409\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/46.jpg 960w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/46-300x179.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/46-768x458.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/46-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/46-600x358.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/46-64x38.jpg 64w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"576\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/47.jpg\" alt=\"\" class=\"wp-image-4410\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/47.jpg 960w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/47-300x180.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/47-768x461.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/47-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/47-600x360.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/47-64x38.jpg 64w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"05-wukesong-ice-sports-center\"><br>05. Wukesong Ice Sports Center<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Design\u4e28Zhu Xiaodi Studio<br>Region\u4e28Beijing Division<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"369\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/49.jpg\" alt=\"\" class=\"wp-image-4411\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/49.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/49-300x173.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/49-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/49-600x346.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/49-64x37.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Wukesong Ice Sports Center is<br>Ice hockey training hall for the Beijing Winter Olympics<br>The project is close to Chang&#8217;an Avenue in Beijing<br>It is currently the largest ultra-low energy sports stadium in the country<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The building skin is like an &#8220;ice ling flower&#8221;<br>Aggregated ice and snow texture image<br>The design strives to combine figurative image symbols with<br>abstract architectural structures are perceptually intertwined<br>in a translucent vision<br>evoke more symbolism<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"442\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/50.jpg\" alt=\"\" class=\"wp-image-4412\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/50.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/50-300x207.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/50-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/50-600x414.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/50-64x44.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The building functions are distributed on two basement floors and two above-ground floors<br>The two basement floors are the ice rink and the audience area with 1,900 fixed seats.<br>Warming up the venue for Olympic training<br>The leisure viewing area is arranged around the ice rink<br>Relevant supporting functional spaces can be used for the audience<br>Provide more diverse viewing methods<br>The two floors above ground are supporting space for sports and culture<br>and 910-seat theatre space<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"427\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/51.jpg\" alt=\"\" class=\"wp-image-4414\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/51.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/51-300x200.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/51-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/51-600x400.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/51-64x43.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"427\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/52.jpg\" alt=\"\" class=\"wp-image-4415\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/52.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/52-300x200.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/52-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/52-600x400.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/52-64x43.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"669\" height=\"1024\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/54-669x1024.jpg\" alt=\"\" class=\"wp-image-4416\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/54-669x1024.jpg 669w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/54-196x300.jpg 196w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/54-768x1175.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/54-1004x1536.jpg 1004w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/54-8x12.jpg 8w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/54-600x918.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/54-64x98.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/54.jpg 1080w\" sizes=\"(max-width: 669px) 100vw, 669px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"06-national-biathlon-center\">06.National Biathlon Center<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>Design\u4e28Architectural Design and Research Institute of Tsinghua University<br>Region\u4e28Zhangjiakou Division<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">National Biathlon Centre will host 11 events<br>It will be the venue with the most gold medals in this Winter Olympics.<br>The architectural shape is clean and neat, simple and generous<br>Internal partition wall adopts<br>Movable, Detachable Lightweight Partition Wall System<br>Facilitate functional conversion after the game<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"399\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/55.jpg\" alt=\"\" class=\"wp-image-4417\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/55.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/55-300x187.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/55-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/55-600x374.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/55-64x40.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The National Biathlon Centre has three tracks<br>They are the competition track in the middle and the training track in the east.<br>and the Winter Paralympic competition track in the North Valley<br>At the same time, the total length of the race track is 8.7 kilometers.<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Adopted by the National Biathlon Center Technology Building<br>Reinforced concrete structure and steel structure building<br>The main functions of the 4 floors above ground are an event management and technical rooms<br>Athletes, technical officials will rest in the future<br>or a place of departure<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"373\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/56.jpg\" alt=\"\" class=\"wp-image-4418\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/56.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/56-300x175.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/56-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/56-600x350.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/56-64x37.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"428\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/57.jpg\" alt=\"\" class=\"wp-image-4419\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/57.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/57-300x201.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/57-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/57-600x401.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/57-64x43.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"07-skywalk-ice-yuhuan\">07.Skywalk &#8220;Ice Yuhuan&#8221;<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>Design\u4e28Architectural Design and Research Institute of Tsinghua University<br>Region\u4e28Zhangjiakou Division<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The air trail &#8220;Bing Yuhuan&#8221; is located in the Zhangjiakou competition area<br>Proposed by the early team from Switzerland<br>The concept of the &#8220;Olympic Ring Complex&#8221; is the starting point<br>Tandem National Ski Jumping Center via elevated trails<br>National Biathlon Center, National Cross Country Ski Center<br>Key buildings such as the Mountain Broadcasting Center and the Technical Officer Hotel<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"358\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/58.jpg\" alt=\"\" class=\"wp-image-4421\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/58.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/58-300x168.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/58-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/58-600x336.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/58-64x36.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">During the game, the promenade can connect various venues<br>It is convenient for the audience to travel between the venues<br>After the game, the promenade can be renovated<br>For entertainment, catering, performing arts<br>Rest, exhibition, and other functions<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"427\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/59.jpg\" alt=\"\" class=\"wp-image-4422\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/59.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/59-300x200.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/59-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/59-600x400.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/59-64x43.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"tw-target-text\">02. <br>New use of the old building <\/h2>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"tw-target-text\">OTHER STADUIM<\/h2>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">This Winter Olympics has a total of 7 major events<br>15 sub-items, 109 sub-items<br>Beijing Division undertakes all ice events<br>Yanqing Division will host snowmobile, sled, and alpine skiing events<br>Zhangjiakou competition area undertakes snow removal vehicles<br>All snow sports except tobogganing and alpine skiing<br>Except for new venues<br>Other competitions will follow<br>Some of the venues under construction for the 2008 Summer Olympics in Beijing<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"360\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/60.jpg\" alt=\"\" class=\"wp-image-4423\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/60.jpg 640w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/60-300x169.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/60-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/60-600x338.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/60-64x36.jpg 64w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"01-national-aquatics-center\">01.National Aquatics Center<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>PTW Architects<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">National Aquatics Centre by Australia and<br>Jointly designed by Chinese enterprises<br>Nicknamed &#8220;Water Cube&#8221;<br>This is another remodeled venue for the 2008 Olympics<br>It is the first venue for the Winter Olympics to be renovated.<br>It is also the first time in the world to use<br>Intelligent technology builds swimming pool conversion ice rink<br>Now, it has a new name &#8211; &#8220;Ice Cube&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/61-1024x683.jpg\" alt=\"\" class=\"wp-image-4424\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/61-1024x683.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/61-300x200.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/61-768x512.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/61-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/61-600x400.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/61-64x43.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/61.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/62-1024x683.jpg\" alt=\"\" class=\"wp-image-4425\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/62-1024x683.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/62-300x200.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/62-768x512.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/62-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/62-600x400.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/62-64x43.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/62.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">&#8220;Water Cube&#8221; becomes &#8220;Ice Cube&#8221;<br>Let the venue in the &#8220;water function&#8221; and<br>Switch freely between &#8220;on-ice functions&#8221;<br>At the same time, it has the ability to carry out water ice sports<br>and the ability of various large-scale events<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"684\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/63-1024x684.jpg\" alt=\"\" class=\"wp-image-4426\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/63-1024x684.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/63-300x200.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/63-768x513.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/63-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/63-600x401.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/63-64x43.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/63.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"569\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/64-1024x569.jpg\" alt=\"\" class=\"wp-image-4427\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/64-1024x569.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/64-300x167.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/64-768x427.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/64-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/64-600x333.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/64-64x36.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/64.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"02-national-stadium\">02.National Stadium<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>Herzog &amp; de Meuron<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Bird&#8217;s Nest as Winter Olympics Opening Ceremony<br>and the venue for the closing ceremony<br>Does not host any sports competitions<br>But it is also one of the venues that attract the attention of the world<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/65-1024x576.jpg\" alt=\"\" class=\"wp-image-4429\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/65-1024x576.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/65-300x169.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/65-768x432.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/65-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/65-600x338.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/65-64x36.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/65.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/66-1024x576.jpg\" alt=\"\" class=\"wp-image-4430\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/66-1024x576.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/66-300x169.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/66-768x432.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/66-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/66-600x338.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/66-64x36.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/66.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"03-national-stadium\">03.National Stadium<\/h3>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">National Stadium in 2008<br>held during the Summer Olympics<br>Rhythmic gymnastics, trampoline, and handball competitions<br>Ice hockey games for the 2022 Winter Olympics will be hosted here<br>Due to its design similar to traditional Chinese folding fans<br>So it is also called &#8220;fan&#8221;<br>The venue can hold 20,000 spectators<br>by German architectural firm<br>Gl\u00f6ckner Architekten GmbH<br>Designed in 2007<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/67-1024x683.jpg\" alt=\"\" class=\"wp-image-4431\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/67-1024x683.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/67-300x200.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/67-768x512.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/67-18x12.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/67-600x400.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/67-64x43.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/67.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"03-winter-olympic-village-design-china-design-and-research-institute-olympic-village\"><br>03. <\/h2>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"03-winter-olympic-village-design-china-design-and-research-institute-olympic-village\">Winter Olympic Village Design <\/h2>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"03-winter-olympic-village-design-china-design-and-research-institute-olympic-village\">China Design and Research Institute <\/h2>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"03-winter-olympic-village-design-china-design-and-research-institute-olympic-village\">Olympic Village<\/h2>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"547\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/68-1024x547.jpg\" alt=\"\" class=\"wp-image-4432\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/68-1024x547.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/68-300x160.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/68-768x410.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/68-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/68-600x321.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/68-64x34.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/68.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">On January 27, Yanqing Winter Olympic Village officially opened its doors to welcome guests<br>The Winter Olympics will host including<br>including the Chinese delegation from all over the world<br>Chinese athletes stay in Yanqing Winter Olympic Village<br>They will participate in the Yanqing Division including<br>Alpine skiing, snowmobiles, sleds<br>4 sub-items including sled<br>21 small items of competition<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"593\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/69-1024x593.jpg\" alt=\"\" class=\"wp-image-4433\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/69-1024x593.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/69-300x174.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/69-768x444.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/69-18x10.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/69-600x347.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/69-64x37.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/69.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Yanqing Winter Olympic Village is one of the Winter Olympic venues<br>Located at the foot of Xiaohai Tuo Mountain<br>Adopt a low-rise, high-density &#8220;mountain village&#8221; style building layout<br>The semi-open building courtyard is built on the mountain<br>Yanqing Winter Olympic Village to be completed by the end of 2020<br>National Alpine Ski Center<br>National Snowmobile Center<br>Full start of snow and ice making<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"528\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/70-1024x528.jpg\" alt=\"\" class=\"wp-image-4434\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/70-1024x528.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/70-300x155.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/70-768x396.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/70-18x9.jpg 18w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/70-600x309.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/70-64x33.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/70.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Yanqing Winter Olympic Village (Winter Paralympic Village) is located in<br>Yanqing competition area core area south area east<br>Located at the foot of Haituo Mountain, a piece of natural formation<br>Relatively gentle alluvial mesa<br>The site is high in the north and low in the south and stretches for 62m<br>The difference between east high and west low is 30m<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"631\" height=\"1024\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/\u5fae\u4fe1\u56fe\u7247_20220215153800-631x1024.jpg\" alt=\"\" class=\"wp-image-4436\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/\u5fae\u4fe1\u56fe\u7247_20220215153800-631x1024.jpg 631w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/\u5fae\u4fe1\u56fe\u7247_20220215153800-185x300.jpg 185w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/\u5fae\u4fe1\u56fe\u7247_20220215153800-768x1247.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/\u5fae\u4fe1\u56fe\u7247_20220215153800-946x1536.jpg 946w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/\u5fae\u4fe1\u56fe\u7247_20220215153800-7x12.jpg 7w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/\u5fae\u4fe1\u56fe\u7247_20220215153800-600x974.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/\u5fae\u4fe1\u56fe\u7247_20220215153800-64x104.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/\u5fae\u4fe1\u56fe\u7247_20220215153800.jpg 1080w\" sizes=\"(max-width: 631px) 100vw, 631px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Total construction area of \u200b\u200bYanqing Winter Olympic Village<br>118,000\u33a1 (91,000\u33a1 above ground)<br>Athletes and team officials during the game<br>Provide 1430 beds and reserved area<br>will be used after the game as<br>Leisure resort opens to society<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"852\" height=\"726\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/71-1.jpg\" alt=\"\" class=\"wp-image-4437\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/71-1.jpg 852w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/71-1-300x256.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/71-1-768x654.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/71-1-14x12.jpg 14w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/71-1-600x511.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/71-1-64x55.jpg 64w\" sizes=\"(max-width: 852px) 100vw, 852px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"816\" height=\"618\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/72.jpg\" alt=\"\" class=\"wp-image-4438\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/72.jpg 816w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/72-300x227.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/72-768x582.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/72-16x12.jpg 16w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/72-600x454.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/72-64x48.jpg 64w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"812\" height=\"612\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/73.jpg\" alt=\"\" class=\"wp-image-4439\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/73.jpg 812w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/73-300x226.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/73-768x579.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/73-16x12.jpg 16w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/73-600x452.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/73-64x48.jpg 64w\" sizes=\"(max-width: 812px) 100vw, 812px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/74-1024x768.jpg\" alt=\"\" class=\"wp-image-4440\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/74-1024x768.jpg 1024w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/74-300x225.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/74-768x576.jpg 768w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/74-16x12.jpg 16w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/74-600x450.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/74-64x48.jpg 64w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/74.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Winter Olympics Black Technology<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The Winter Olympic Village is not only a warm environment<br>The smart bed in the room also stuns athletes from all over the world<br>Memory foam mattress<br>Foreign players cry with envy: much better than Tokyo cardboard beds!<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"636\" height=\"558\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/75.jpg\" alt=\"\" class=\"wp-image-4441\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/75.jpg 636w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/75-300x263.jpg 300w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/75-14x12.jpg 14w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/75-600x526.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/75-64x56.jpg 64w\" sizes=\"(max-width: 636px) 100vw, 636px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">remote control with eight buttons<br>Adjustable to various angles at the push of a button<br>Sleeping position, sitting position, any position is completely OK<br>There&#8217;s even a &#8220;zero gravity mode&#8221;<br>Surprise the athlete<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"636\" height=\"764\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/76.jpg\" alt=\"\" class=\"wp-image-4442\" srcset=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/76.jpg 636w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/76-250x300.jpg 250w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/76-10x12.jpg 10w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/76-600x721.jpg 600w, https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/76-64x77.jpg 64w\" sizes=\"(max-width: 636px) 100vw, 636px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">After the Beijing Olympic Media Center was opened<br>Its smart restaurant suddenly exploded<br>It has become an online celebrity check-in place for domestic and foreign media friends<br>Automated visualization, efficient and intelligent catering<br>The best feature of this restaurant<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"720\" height=\"405\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/77.gif\" alt=\"\" class=\"wp-image-4443\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"556\" height=\"312\" src=\"http:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/78.gif\" alt=\"\" class=\"wp-image-4444\"\/><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">When the Beijing Winter Olympics are underway<br>Excellent venue and Winter Olympic Village design<br>Not only provides a solid foundation for athletes&#8217; competitions<br>It also highlights our strong engineering and design capabilities<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Design together and wish the Beijing 2022 Winter Olympics a complete success!<\/p>","protected":false},"excerpt":{"rendered":"<p>Gu Ailing(Eileen)  won the gold medal at the Winter Olympics. Beijing Shougang Ski platform design scheme<\/p>","protected":false},"author":1,"featured_media":4383,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[145,146],"tags":[],"class_list":["post-4355","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-decoration-design","category-decorative-building-materials"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Beijing Winter Olympics kicked off! A glimpse of the venue&#039;s cutting-edge design - Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/kerooya.com\/zh\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Beijing Winter Olympics kicked off! A glimpse of the venue&#039;s cutting-edge design - Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier\" \/>\n<meta property=\"og:description\" content=\"Gu Ailing(Eileen) won the gold medal at the Winter Olympics. Beijing Shougang Ski platform design scheme\" \/>\n<meta property=\"og:url\" content=\"https:\/\/kerooya.com\/zh\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/\" \/>\n<meta property=\"og:site_name\" content=\"Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-15T07:50:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-09-12T10:54:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"667\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"keooya\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u4f5c\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"keooya\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/\"},\"author\":{\"name\":\"keooya\",\"@id\":\"https:\\\/\\\/kerooya.com\\\/#\\\/schema\\\/person\\\/e667a3bbb8d2990dac43f2df9d0957f8\"},\"headline\":\"The Beijing Winter Olympics kicked off! A glimpse of the venue&#8217;s cutting-edge design\",\"datePublished\":\"2022-02-15T07:50:06+00:00\",\"dateModified\":\"2023-09-12T10:54:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/\"},\"wordCount\":1929,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/kerooya.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kerooya.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/19.jpg\",\"articleSection\":[\"Decoration design\",\"Decorative building materials\"],\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/\",\"url\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/\",\"name\":\"The Beijing Winter Olympics kicked off! A glimpse of the venue's cutting-edge design - Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kerooya.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kerooya.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/19.jpg\",\"datePublished\":\"2022-02-15T07:50:06+00:00\",\"dateModified\":\"2023-09-12T10:54:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/#breadcrumb\"},\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/#primaryimage\",\"url\":\"https:\\\/\\\/kerooya.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/19.jpg\",\"contentUrl\":\"https:\\\/\\\/kerooya.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/19.jpg\",\"width\":1080,\"height\":667},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/kerooya.com\\\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/kerooya.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Beijing Winter Olympics kicked off! A glimpse of the venue&#8217;s cutting-edge design\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/kerooya.com\\\/#website\",\"url\":\"https:\\\/\\\/kerooya.com\\\/\",\"name\":\"Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier\",\"description\":\"Custom Metal Products, Smart Glass, Signage &amp; Decorative Lighting - Factory Direct Pricing with Global Shipping\",\"publisher\":{\"@id\":\"https:\\\/\\\/kerooya.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/kerooya.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-Hans\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/kerooya.com\\\/#organization\",\"name\":\"Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier\",\"url\":\"https:\\\/\\\/kerooya.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\\\/\\\/kerooya.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/kerooya.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/2ab605dd2c450c97e83cef9892c0e13_\u526f\u672c.png\",\"contentUrl\":\"https:\\\/\\\/kerooya.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/2ab605dd2c450c97e83cef9892c0e13_\u526f\u672c.png\",\"width\":359,\"height\":106,\"caption\":\"Kerooya Building materials customization  - China Building Materials Manufacturer &amp; Wholesale Supplier\"},\"image\":{\"@id\":\"https:\\\/\\\/kerooya.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/kerooya.com\\\/#\\\/schema\\\/person\\\/e667a3bbb8d2990dac43f2df9d0957f8\",\"name\":\"keooya\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\\\/\\\/kerooya.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Aaron-100x100.jpg\",\"url\":\"https:\\\/\\\/kerooya.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Aaron-100x100.jpg\",\"contentUrl\":\"https:\\\/\\\/kerooya.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Aaron-100x100.jpg\",\"caption\":\"keooya\"},\"description\":\"Hello everyone, I am kerooya, the investor of keooya.com. I have been running a company in China for 17 years, which is an architectural decoration design and construction company as well as a building materials production factory. It is well understood that the owner, the design side, and the construction side are important to the building decoration materials in the whole project process.keooya.com, the purpose of this article is to share the knowledge about building decoration materials from the perspective of Chinese building decoration materials factories and suppliers\",\"sameAs\":[\"http:\\\/\\\/kerooya.com\"],\"url\":\"https:\\\/\\\/kerooya.com\\\/zh\\\/author\\\/koomiya\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Beijing Winter Olympics kicked off! A glimpse of the venue's cutting-edge design - Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/kerooya.com\/zh\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/","og_locale":"zh_CN","og_type":"article","og_title":"The Beijing Winter Olympics kicked off! A glimpse of the venue's cutting-edge design - Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier","og_description":"Gu Ailing(Eileen) won the gold medal at the Winter Olympics. Beijing Shougang Ski platform design scheme","og_url":"https:\/\/kerooya.com\/zh\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/","og_site_name":"Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier","article_published_time":"2022-02-15T07:50:06+00:00","article_modified_time":"2023-09-12T10:54:04+00:00","og_image":[{"width":1080,"height":667,"url":"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19.jpg","type":"image\/jpeg"}],"author":"keooya","twitter_card":"summary_large_image","twitter_misc":{"\u4f5c\u8005":"keooya","\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"10 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/#article","isPartOf":{"@id":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/"},"author":{"name":"keooya","@id":"https:\/\/kerooya.com\/#\/schema\/person\/e667a3bbb8d2990dac43f2df9d0957f8"},"headline":"The Beijing Winter Olympics kicked off! A glimpse of the venue&#8217;s cutting-edge design","datePublished":"2022-02-15T07:50:06+00:00","dateModified":"2023-09-12T10:54:04+00:00","mainEntityOfPage":{"@id":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/"},"wordCount":1929,"commentCount":0,"publisher":{"@id":"https:\/\/kerooya.com\/#organization"},"image":{"@id":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/#primaryimage"},"thumbnailUrl":"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19.jpg","articleSection":["Decoration design","Decorative building materials"],"inLanguage":"zh-Hans","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/","url":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/","name":"The Beijing Winter Olympics kicked off! A glimpse of the venue's cutting-edge design - Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier","isPartOf":{"@id":"https:\/\/kerooya.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/#primaryimage"},"image":{"@id":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/#primaryimage"},"thumbnailUrl":"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19.jpg","datePublished":"2022-02-15T07:50:06+00:00","dateModified":"2023-09-12T10:54:04+00:00","breadcrumb":{"@id":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/#breadcrumb"},"inLanguage":"zh-Hans","potentialAction":[{"@type":"ReadAction","target":["https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/"]}]},{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/#primaryimage","url":"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19.jpg","contentUrl":"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/02\/19.jpg","width":1080,"height":667},{"@type":"BreadcrumbList","@id":"https:\/\/kerooya.com\/the-beijing-winter-olympics-kicked-off-a-glimpse-of-the-venues-cutting-edge-design\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/kerooya.com\/"},{"@type":"ListItem","position":2,"name":"The Beijing Winter Olympics kicked off! A glimpse of the venue&#8217;s cutting-edge design"}]},{"@type":"WebSite","@id":"https:\/\/kerooya.com\/#website","url":"https:\/\/kerooya.com\/","name":"Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier","description":"Custom Metal Products, Smart Glass, Signage &amp; Decorative Lighting - Factory Direct Pricing with Global Shipping","publisher":{"@id":"https:\/\/kerooya.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/kerooya.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-Hans"},{"@type":"Organization","@id":"https:\/\/kerooya.com\/#organization","name":"Kerooya Building materials customization - China Building Materials Manufacturer &amp; Wholesale Supplier","url":"https:\/\/kerooya.com\/","logo":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/kerooya.com\/#\/schema\/logo\/image\/","url":"https:\/\/kerooya.com\/wp-content\/uploads\/2021\/11\/2ab605dd2c450c97e83cef9892c0e13_\u526f\u672c.png","contentUrl":"https:\/\/kerooya.com\/wp-content\/uploads\/2021\/11\/2ab605dd2c450c97e83cef9892c0e13_\u526f\u672c.png","width":359,"height":106,"caption":"Kerooya Building materials customization  - China Building Materials Manufacturer &amp; Wholesale Supplier"},"image":{"@id":"https:\/\/kerooya.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/kerooya.com\/#\/schema\/person\/e667a3bbb8d2990dac43f2df9d0957f8","name":"keooya","image":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/10\/Aaron-100x100.jpg","url":"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/10\/Aaron-100x100.jpg","contentUrl":"https:\/\/kerooya.com\/wp-content\/uploads\/2022\/10\/Aaron-100x100.jpg","caption":"keooya"},"description":"Hello everyone, I am kerooya, the investor of keooya.com. I have been running a company in China for 17 years, which is an architectural decoration design and construction company as well as a building materials production factory. It is well understood that the owner, the design side, and the construction side are important to the building decoration materials in the whole project process.keooya.com, the purpose of this article is to share the knowledge about building decoration materials from the perspective of Chinese building decoration materials factories and suppliers","sameAs":["http:\/\/kerooya.com"],"url":"https:\/\/kerooya.com\/zh\/author\/koomiya\/"}]}},"_links":{"self":[{"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/posts\/4355","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/comments?post=4355"}],"version-history":[{"count":18,"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/posts\/4355\/revisions"}],"predecessor-version":[{"id":7302,"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/posts\/4355\/revisions\/7302"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/media\/4383"}],"wp:attachment":[{"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/media?parent=4355"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/categories?post=4355"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kerooya.com\/zh\/wp-json\/wp\/v2\/tags?post=4355"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}